Вход на сайт

Просмотр новости

Найдите то, что Вас интересует

India's 7,000-km bullet rail plan gets homegrown signalling push

Дата публикации: 22-07-2026 18:49:33

India is developing its own high-speed rail signalling protocol, the Bharat Train Control System. This system will be tailored for Indian conditions and reduce foreign technology dependence. Designs and route plans for future bullet-train corridors are expected by mid-2027. The new protocol will be open-source and cost-effective for nationwide deployment. Domestic suppliers will benefit from the country's own high-speed train operation protocols.

Основное содержимое страницы с новостью.

Synopsis

India is developing its own high-speed rail signalling protocol, the Bharat Train Control System. This system will be tailored for Indian conditions and reduce foreign technology dependence. Designs and route plans for future bullet-train corridors are expected by mid-2027. The new protocol will be open-source and cost-effective for nationwide deployment. Domestic suppliers will benefit from the country's own high-speed train operation protocols.

India Bullet Train DesignTIMESOFINDIA.COMIndia is developing its own high-speed rail signalling protocol, the Bharat Train Control System

New Delhi: The Indian Railways is readying its own high-speed rail signalling protocol, the Bharat Train Control System (BTCS), senior officials said.

This will be tailored for Indian conditions and eliminate dependence on foreign technology protocols for the nearly 7,000-km new bullet-train corridors planned in India.

Approvals for designs and route plans for future bullet-train corridors are also expected to be finalised by mid-2027.


Also Read: Bullet train: Second tunnel boring machine begins excavation for tunnel beneath Thane creek

"India will develop its own control protocols for high-speed rail," a senior official told ET, adding this will build upon the experience of the Mumbai-Ahmedabad

High Speed Rail (MAHSR) corridor where the European Train Control System (ETCS) is being installed.

"The Bharat Train Control System will be open-source, cost-effective and can be tailored to requirements of rapid and safe deployment across the country," the official said, adding that once ready, it could be offered to other countries as well.

"Domestic railway design and equipment suppliers will get a fillip from the country's own high-speed train operation protocols," the official added.

Last June, National High Speed Rail Corporation Ltd awarded a Rs 4,100 crore signalling system contract for the MAHSR corridor to a consortium of India's Dineshchandra R Agrawal Infracon Pvt Ltd and Siemens of Germany. The two are implementing ETCS Level 2-based systems that are designed to support operations at speeds up to 350 km an hour.

Screenshot 2026-07-23 003048

India's bullet train vision

The Delhi-Meerut Rapid Rail Corridor, where India's fastest train currently operates, also has ETCS Level 2 signalling which was implemented by France's Alstom.

Sector watchers said India's decision to opt for ETCS Level 2 signalling on the Japan-backed MAHSR opened the project for a wider range of equipment suppliers.

Also Read: India and Japan opt for indigenous bullet trains

Earlier this month, former Japan minister Hideki Makihara accused India of not relying solely on Japanese technology for the MAHSR project, flagging the decision to opt for open-source signalling protocols instead of Japan's Digital Automatic Train Control.

Responding to concerns, officials said trains offered by Japan's Hitachi are compatible with ETCS but "offers from them (Japan) need to come first".

India is also "open to allowing switchover to Japanese protocols once suppliers place appropriate proposals", the official added.

Схожие новости

#Наименование новостиТональностьИнформативностьДата публикации
1India and Japan opt for indigenous bullet trains 09.9919-07-2026
2Инженеры разрабатывают конструкторскую документацию первого российского поезда для ВСМ0026-02-2025
3Cabinet approves Rs 1,264 crore Ballari-Guntakal railway project linking Andhra Pradesh and Karnataka 011.424-07-2026
4Bullet train: Second tunnel boring machine begins excavation for tunnel beneath Thane creek 06.1818-07-2026
5Cabinet clears Rs 1,264 crore Ballari-Guntakal rail line expansion, says MoS V Somanna 012.4524-07-2026
6Индия готовится запустить первый водородный поезд5710-07-2026
7India launches first hydrogen-powered train built in the country to expand clean energy on railways5717-07-2026
8В Индии проходят испытания первого отечественного поезда на водородном топливе5701-07-2026
9Индия на ПМЭФ договорилась с РЖД выработать рамочную структуру сотрудничества0021-06-2025
10Высокоскоростной поезд в будущем будет управляться ИИ0029-08-2025

Классификация: Национальные проекты. Схожих патентов: 0. Схожих новостей: 10. Тональность: 0. Информативность: 11.46. Источник: economictimes.indiatimes.com.