Вход на сайт

Просмотр новости

Найдите то, что Вас интересует

Procurement Underway for Cape Cod Bridge Replacement

Дата публикации: 30-09-2026 16:45:00

The Massachusetts Dept. of Transportation has begun the process of selecting a design-build team to replace the 91-year-old Sagamore Bridge, with a request for proposals for the estimated $2.5 billion project.

Основное содержимое страницы с новостью.

A rendering of a planned arch bridge over the Cape Cod Canal

Rendering courtesy MassDOT

The Cape Cod Bridges Program in Massachusetts, which is planned to replace a pair of aging bridges owned by the U.S. Army Corps of Engineers, is entering its procurement phase. 

The Massachusetts Dept. of Transportation has begun the process of selecting a design-build team to replace the 91-year-old Sagamore Bridge, announcing the release of the request for proposals for the estimated $2.5-billion project.

The project is the initial phase of the agency’s Cape Cod Bridges Program, which also includes the eventual replacement of the nearby Bourne Bridge. Both crossings of the Cape Cod Canal are operated by the U.S. Army Corps of Engineers, which built the bridges in the early 1930s, and represent the sole highway links to the peninsula. The bridges are considered to be “functionally obsolete,” with the Corps rating the Sagamore Bridge in fair condition, and the Bourne Bridge in poor condition.

Targeting a winter 2027 construction start, MassDOT’s plan for the Sagamore Bridge calls for separate east- and westbound spans similar in appearance to the existing 1,400-ft-long, 40-ft-wide steel arch structure. The new spans will include 12-ft travel lanes, and 10- and 4-ft-wide shoulders. The westbound span will also provide a 14-ft-wide pathway for cyclists and pedestrians.

According to MassDOT, the bridge’s main spans are to be constructed off site, floated in on the canal and lifted into place. The eastbound span is scheduled to be open to traffic in 2033, after which the existing Sagamore Bridge will then be demolished, and construction on the new westbound span will get underway.

Also included in the project are reconstruction of roadway interchanges and improvements to local and regional infrastructure for Cape Cod’s year-round residents and more than five million annual visitors.

Responses to the RFP are due in May 2027, with a public bid opening scheduled for the following July. The contract will include a requirement for a project labor agreement with the Southeastern Massachusetts Building Trades Council and the North Atlantic States Regional Council of Carpenters.

Announcement of the RFP release coincides with the receipt of nearly $1 billion in federal Bridge Improvement Program grant funding for the project, with an additional $371 million from the Federal Highway Administration expected to be authorized in October. Previously secured federal grants and state bond funds allowed MassDOT to begin foundation load testing for the new bridge in May, with piles driven up to 90 ft deep, according to local media reports.

Meanwhile, MassDOT and the Corps are awaiting a decision of their application for $1 billion in federal grant funding for replacing the 2,384-ft-long Bourne Bridge. Under a 2020 memorandum of understanding between Massachusetts and the Corps, MassDOT will assume ownership and maintenance of both structures and approaches once the replacement program is complete.

Схожие новости

#Наименование новостиТональностьИнформативностьДата публикации
1Carolabrücke: Dresden vergibt Auftrag an Planungsteam015.0925-09-2026
2Long-Delayed $3.2B Alabama Bridge Project Clears Final Funding Hurdle015.0929-09-2026
3NH Bridge, Age 103, Reopens After New Inspection Clears Structural Concerns 011.6327-09-2026
4Lane closures planned on I-90 in Becket, Russell06.7826-09-2026
5ОСК приступила к строительству головного сухогруза KSD1 нового поколения021.1128-09-2026
6ODOT hopeful Wick Avenue Bridge will reopen next week06.9429-09-2026
7El concurso para el desvío de la Saleta se demora a petición de las empresas07.7103-09-2026
8Замену наплавного моста через реку Немонин продлили до 31 октября012.3727-09-2026
9Navy unveils $1.7B deal to modernize sailor housing in Hampton Roads05.0516-09-2026
10Строительство моста на Северном обходе вышло на новый этап015.2628-09-2026

Классификация: Санкт Петербург. Схожих патентов: 0. Схожих новостей: 10. Тональность: 0. Информативность: 10.39. Источник: www.enr.com.