Вход на сайт

Просмотр новости

Найдите то, что Вас интересует

Corps of Engineers Outlines $10B Plan to Protect Boston's Coastline

Дата публикации: 02-08-2026 20:00:00

Federal engineers recommend a multidecade network of floodwalls, deployable barriers and shoreline improvements to reduce storm surge risk for Boston's vulnerable waterfront communities by 2090.

Основное содержимое страницы с новостью.

The U.S. Army Corps of Engineers has released a draft study outlining $10 billion in projects to protect the city of Boston from extreme weather and sea-level rise over the next several decades. The plan, released jointly with the city on July 24, scopes at least 20 different infrastructure projects along 16 miles of the 47-mile urban coastline. 

“The future of our city depends on the steps we take now to build resilient communities." city mayor Michelle Wu (D) said in a statement. "With more frequent flooding in vulnerable areas during extreme weather events, the Coastal Storm Risk Management Feasibility Study is critical to understanding how to protect inland neighborhoods most at risk and unlocking resources to take action,” 

The city is expected to see between 10 and 18 inches of sea-level rise by 2050, according to the Green Ribbon Commission, a coalition of local civic and business leaders partnering with the city to advance resilience and decarbonization initiatives. “Our members represent some of the largest institutions and employers in Boston, and they are telling us clearly that reducing risk from flooding is an urgent priority to be solved before it’s too late,” said Rebecca Herst, commission associate director and director of climate resilience. 

Although projects outlined in the study would require substantial investment, costs will be far higher if Boston fails to take action, city officials say. The Corps estimates the city could face $54 billion in losses by the end of the century if it does nothing. But for every $1 invested, the public sector could save at least $4 in avoided costs, according to Corps estimates. 

“The reality is that doing nothing is not a viable option. Without action, the costs to public safety and economic vitality from coastal flooding will only be compounded,” said Lt. Col. David MacPhail, deputy commander of the Corps New England District, in a statement. 

The 20 projects outlined in its feasibility study would permanently close coastal pathways that are most likely to negatively impact public safety and the city’s economy when flooded. 

The $10-billion figure cited by the Corps does not include additional cost estimates for project upgrades to improve public access to the city’s harbor. Local officials say they expect to spend billions more for green infrastructure projects along the coastline.

Looking for quick answers on construction and engineering topics?
Try Ask ENR, our new smart AI search tool.
Ask ENR

USACE map of projected 2090 coastal storm inundation around Boston Harbor under intermediate and high sea-level rise scenarios.

This U.S. Army Corps of Engineers screening map shows areas around Boston Harbor projected to experience inundation under a 1% annual-chance coastal storm by 2090. Dark purple indicates flooding with intermediate sea-level rise, while light blue shows the expanded inundation area under a high sea-level rise scenario.

Image: U.S. Army Corps of Engineers

Building on a 2025 report released by the state of Massachusetts, the Green Ribbon Commission analyzed funding mechanisms the city can use to pay for the 35% non-federal portion of its cost-share agreement with the federal government. 

“Our goal with this project is to really understand where we're at, to clarify the costs, the benefits, the gaps between the current investments that are being made toward resilience, and where we need to get to, and then identify a number of different strategies that we could pursue,” Herst told ENR. “The Army Corps project is a generational opportunity to receive federal funding to invest in our coastline, but Boston needs a strategy that is viable and implementable to meet the match."

Consultant Arcadis leads the commission’s coastal resilience task force, along with Throwe Environmental and the Consensus Building Institute, which has been conducting the analysis. 

“The first task is to really define the cost that we're trying to get to, and it's not just the capital cost because programs like this have to be maintained, Carly Foster, Arcadis water management practice director, told ENR. "There's going to be a broad range of potential costs that we're facing depending on the implementation schedule as well as the delivery model." 

Foster said that clients using progressive design-build for climate adaptation projects are netting one-quarter to one-third in cost savings over traditional design-bid-build approaches.

The task force plans to finalize its financial blueprint by next summer, coinciding with the Corps' final feasibility study. The agency will accept public comment on the analysis through Sept. 18. 

Схожие новости

#Наименование новостиТональностьИнформативностьДата публикации
1Cranston neighborhood getting $1 million to address flooding0707-07-2026
2Алиханов: защита морского побережья под Калининградом от размыва сохранит 12,8 млрд рублей0019-05-2021
3Росводресурсы обеспечат защиту от наводнений до 30 тыс. человек к концу года0008-08-2025
4Регионам ДФО выделят 10 млрд рублей в течение двух лет на защиту от паводков0026-10-2021
5Проект развития прибрежной зоны в Дагестане утвердят до конца 2023 года0004-05-2023
6Connecticut, New York lawmakers push to speed up Greenwich flood-control bridge project016.1901-01-1970
7На завершение берегоукрепления набережной Благовещенска нужно более 3 млрд рублей0004-08-2021
8На противопаводковые сооружения в 2023 году выделили 5,1 млрд рублей0020-01-2023
9Глава Приамурья предложил создать федеральную программу расселения из зон подтопления0001-02-2023

Классификация: Санкт Петербург. Схожих патентов: 0. Схожих новостей: 9. Тональность: 0. Информативность: 10.38. Источник: www.enr.com.